Planning appeal decision

Decision7 October 20163142075

Preeshenlle Henlle Lane, Gobowen Oswestry Shropshire SY10 7AX

without planning permission, the erection of a building for the purposes of residential use on the Land (shown approximately marked with a red cross on the attached plan).  The requirements of the notice are to remove the building from the Land.  The period for compliance with the requirements is 6 months.  The appeals are proceeding on the grounds set out in section 174(2)(b), (c) and (e) of the Town and Country Planning Act 1990 as amended. Since the prescribed fees have not been paid within the specified period, the appeals on ground (a) and the application for planning permission deemed to have been made under section 177(5) of the Act as amended have lapsed

Authority
Shropshire Council
Appeal type
enforcement · Enforcement Notice Appeal
Procedure
Hearing
Postcode
SY10 7AX

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.