Planning appeal decision

Allowed12 February 20253351801

Linton Mill, Wintringham, MALTON, YO17 8HP

the installation of an ETA HACK 350 biomass boiler within an existing building to replace existing straw burning biomass boilers

Authority
North Yorkshire Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Change of use
Inspector
Eggleton P

Main issues, as the Inspector framed them

  • The effect on the living conditions of the residents of nearby dwellings in relation to noise, smoke and odour from the proposed biomass boiler

What decided it

Subject to conditions restricting fuel type and storage location, the technical information provided demonstrated the proposed biomass boiler would not result in unacceptable harm to the living conditions of neighbouring residents or businesses.

Plan policies cited: Policy SP20 of the Ryedale Local Plan Strategy 2013

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.