Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice varied and upheld26 November 20253353485

Marsh Lane, Beal, DN14 0SL

Authority
North Yorkshire Council
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
other · Other minor developments
Inspector
Berry A

Main issues, as the Inspector framed them

  • Whether the fence constitutes a breach of planning control (ground c)
  • Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach (ground f)
  • Whether the period specified for compliance is reasonable (ground g)

What decided it

The fence exceeds the 1m height limit prescribed by the GPDO for structures adjacent to highways used by vehicular traffic and therefore does not benefit from permitted development rights.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.