Planning appeal decision
land adjacent Puckpool House, Puckpool Hill, Ryde, Isle of Wight, PO33 1PJ
Without planning permission, operational development by the unauthorised construction of three outbuildings, the unauthorised construction of two main front boundary walls that are in excess of one metre in height and the unauthorised construction of three brick and render entrance piers that are in excess of one metre in height
- Authority
- Isle of Wight Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Householder developments
- Inspector
- Hocking P
Main issues, as the Inspector framed them
- Whether the largest outbuilding was substantially completed before 7 February 2016 such that enforcement action was time-barred
- Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control
- Whether the time periods for compliance with the enforcement notice are reasonable
What decided it
The date-stamped photographs taken by the Council on 13 April 2016 demonstrating the building was still under construction, contradicting the appellant's assertion of completion by February 2016.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®