Planning appeal decision
79 Windmill Hill, Enfield, EN2 7AF
redevelopment of the site, including the demolition of the existing buildings and the construction of 49 residential units across three buildings, (including a shared basement level between B and C) with associated parking, landscaping, access road, and other site infrastructure
- Authority
- London Borough of Enfield
- Appeal type
- major · Planning Appeal
- Procedure
- Hearing
- Development
- residential · Major dwellings
- Inspector
- Sturgess M
Main issues, as the Inspector framed them
- whether the proposed development would deliver the required amount of affordable housing, having regard to the viability of the proposal
- whether the proposal would deliver the appropriate mix of dwellings on the site
- whether the proposal would optimise the use of the site and therefore make efficient use of land
What decided it
The proposal was found to accord with the development plan as a whole (on affordable housing viability, housing mix under the newer London Plan policy, and site density/optimisation), and no material considerations indicated the appeal should be decided otherwise.
the proposal accords with the development plan as a whole and no material considerations were sufficient to indicate the appeal should be decided other than in accordance with the development plan
Framework references: 57, 174
Plan policies cited: Policy CP3, Policy DMD 1, Policy H4, Policy CP5, Policy DMD3, Policy H10, Policy DMD6, Policy 3.4, Policy CP13, Policy CP16, Policy DMD51, Policy CP20, Policy DMD50, Policy DMD53
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®