Planning appeal decision
Strong Base Construction Ltd, Unit 11, Boston Business Park Trumpers Way, LONDON, W7 2QA
a biomass boiler and associated external silo and flue
- Authority
- London Borough of Ealing
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- utilities-energy · Other minor developments
- Inspector
- Davies B
Main issues, as the Inspector framed them
- Whether or not the development would meet local and national policies in respect of emissions to air
What decided it
The air quality assessment and technical details demonstrated that emissions would be minimal and largely contained on-site, while the significant reduction in HGV road trips would offset new emissions, thereby meeting local and national air quality policies.
Framework references: 186
Plan policies cited: Policy 7A of the Ealing Development Management Development Plan Document (2013), Policy SI 1 of the London Plan (2021), Policy SI 2 of the London Plan (2021), Policy GG3 of the London Plan (2021)
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®