Notice varied and upheld25 October 20213276456

Slate Mill, Tewkesbury Road, Elmstone Hardwick, Cheltenham, Gloucestershire, GL51 9TA

Planning appeal 3276456 at Slate Mill, Tewkesbury Road, Elmstone Hardwick, Cheltenham, Gloucestershire, GL51 9TA (Tewkesbury Borough Council) was allowed in part (a split decision) on 25 October 2021 by Inspector Curnow R, by written representations. The main issue, as the Inspector framed it: Whether, at the date the enforcement notice was issued, no enforcement action could be taken in respect of the breach of planning control alleged (Ground d).

Without planning permission, the material change of use of the land showed edged red on the attached plan from agricultural use to use for residential purposes and the consequent erection of a new residential dwelling thereon as shown edged blue on the said attached plan

Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
residential · Change of use
Inspector
Curnow R
Postcode
GL51 9TA

Main issues, as the Inspector framed them

  • Whether, at the date the enforcement notice was issued, no enforcement action could be taken in respect of the breach of planning control alleged (Ground d)
  • Whether the steps required by the notice exceed what is necessary to remedy the breach of planning control (Ground f)

What decided it

The operational development was integral to the material change of use and the material change of use had not occurred for the ten years required by s.171B(3), therefore the enforcement notice was issued in a timely manner.

What the Inspector cited

Judgments
Hibbitt v SSCLG [2016] EWHC 2853; Murfitt v SSE & East Cambridgeshire DC [1980] JPL 598; Somak Travel v SSE & Brent LBC [1987] JPL 630; Welwyn Hatfield BC v SSCLG & Beesley [2011] UKSC 15; Bowring v SSCLG & Waltham Forest LBC [2013] EWHC 1115 (Admin); Kestrel Hydro v SSCLG & Spelthorne BC [2015] 1654 (Admin), [2016] EWCA Civ 784

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

14 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in Tewkesbury

The authority’s record since 2016 · every decision in 2021

  1. Allowed3 July 20263362936
    Homestead Farm Churchend, Twyning, Tewkesbury, GL20 6DA
  2. Dismissed7 May 20263348446
    Plot 6, Warren Fruit Farm, Cheltenham, GL54 5BN
  3. Notice upheld7 May 20263341916
    Plot 10, Warren Fruit Farm, Evesham Road, Greet, Gloucestershire, GL54 5BN
  4. Notice varied and upheld7 May 20263341850
    Evesham Road, Greet, Gloucestershire, GL54 5BN
  5. Notice varied and upheld12 February 20263360223
    Land at The Lays, Oakle Street, Minsterworth, Gloucestershire, GL2 8JR

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.