Planning appeal decision
Tokyngton Community Centre, St Michaels Avenue, Wembley, HA9 6SA
described in the application as: an extension to community centre to house community programmes. Summary
- Authority
- London Borough of Brent
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- community-institutional · Other minor developments
- Inspector
- Moss J
Main issues, as the Inspector framed them
- The effect of the development on the character and appearance of the appeals site and the surrounding area
- Whether or not the development is or would be acceptable within an area of open space, having regard to policies for development in such a location
What decided it
Both schemes result in unacceptable loss of protected open space that cannot be justified under NPPF paragraph 99 or London Plan Policy G4, and this conflict with the development plan is not outweighed by material considerations.
Framework references: 98, 99
Plan policies cited: Policy DMP1, Policy BD1, Policy D4, Policy G4, Policy BSI1, Policy S1, Policy BT1, Policy BT2
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®