Planning appeal decision
19 Avon Road, Torquay, TQ2 7LU
Planning appeal 3278161 at 19 Avon Road, Torquay, TQ2 7LU (Torbay Council) was allowed on 9 November 2021 by Inspector Jones M, by written representations. The main issue, as the Inspector framed it: The effect of the proposal on the character and appearance of the area.
first floor extension over existing flat roof construction
- Authority
- Torbay Council
- Appeal type
- householder · Householder (HAS)
- Procedure
- Written Representations
- Development
- residential · Householder developments
- Inspector
- Jones M
- Postcode
- TQ2 7LU
Main issues, as the Inspector framed them
- The effect of the proposal on the character and appearance of the area
What decided it
The extension's deferential positioning below the existing roof line and modest width would preserve the integrity and symmetrical legibility of the terrace, and the resulting gap would be consistent with existing variations in the street.
What the Inspector cited
- Development plan policies
- Policy DE1Policy DE5Policy TH8
How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.
See how each was appliedThe decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in Torbay
The authority’s record since 2016 · every decision in 2021
- Dismissed29 October 2026601535737 Kingsway Avenue, Paignton, TQ4 7AA
- Dismissed26 October 2026601238127 Roselands Drive, Paignton, TQ4 7DS
- Dismissed22 October 202660143338 Colin Road, Paignton, TQ3 2NR
- Allowed23 September 20266006957Land Rear Of 1A St James Road, Torquay, TQ1 4AZ
- Dismissed10 September 2026601385541 Orkney Close, Torquay, TQ2 7DS
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®