Allowed18 February 20223279533

Land North of Halloughton, Halloughton, Southwell, Nottinghamshire, NG25 0QR

the construction of a solar farm and battery stations together with all associated works, equipment, and necessary infrastructure

Authority
Newark & Sherwood District Council
Appeal type
major · Planning Appeal
Procedure
Inquiry
Development
utilities-energy · Other Major Developments
Inspector
Baird G

Main issues, as the Inspector framed them

  • The landscape and visual impact of the scheme
  • The effect on heritage assets
  • Whether the proposal would conflict with the development plan and if so whether there are any material considerations that would outweigh that conflict; the planning balance

What decided it

The very significant benefits of the scheme's contribution to renewable energy generation and decarbonisation clearly and decisively outweighed the limited landscape, visual and heritage harm identified.

The imperative to tackle climate change and the very significant benefits of the scheme (renewable energy generation and biodiversity net gain) clearly and decisively outweighed the limited, localised landscape and visual harm and the temporary less-than-substantial harm to heritage assets.

Framework references: 174, 199, 200

Plan policies cited: Policy CP 9, Policy CP 10, Policy CP 13, Policy CP 14, Policy DM 4, Policy DM5, Policy DM9, Policy E6, Policy DH3, CS Policy 9, AD&M Policy DM5, SNP Policy E2, CS Policy 12, AD&M Policy DM8