Planning appeal decision
Land off Blacker Lane, Wakefield, West Yorkshire, WF4 3DW
Without planning permission: a material change of use of land from agriculture to storage of demolition waste, plant, machinery, vehicles, metal sheets and frames, timber, beer barrels, oil drums, mobile concrete barriers and siting of shipping containers, portable office and associated operational development involving the excavation of land, installation of concrete foundations, the installation of drainage and other pipes and erection of a shed on the land in the Green Belt (in the locations shown in the plan attached to the enforcemen t notice)
- Authority
- Wakefield Metropolitan District Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- minerals-waste · Not Applicable
- Inspector
- Gray E
Main issues, as the Inspector framed them
- Whether the time given to comply with the enforcement notice is too short (ground (g))
What decided it
The passage of time between the enforcement notice and the appeal decision meant the winter weather constraint no longer applied, and the appellants provided no other substantive objection to the 16-week period.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®