Planning appeal decision
A69, Lemington, Blucher, Newcastle Upon Tyne, NE5 5AB
a 20.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works
- Authority
- Newcastle Upon Tyne City Council
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- telecoms · Other minor developments
- Inspector
- Robbie G
Main issues, as the Inspector framed them
- the effect of the proposed development's siting on highway safety
What decided it
The proposal fails to demonstrate how its siting would allow safe interaction with existing transport networks and does not provide adequate mitigation of highway safety harm arising from the shortcomings of the appeal site location.
The economic and social benefits of improved 5G telecommunications infrastructure were outweighed by the unmitigated harm to highway safety arising from the site's location and immediate surroundings.
Plan policies cited: DM13, CS13 (3iii), DM12(3), DM14(1), DM35
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®