Planning appeal decision
Land at 87 Chapman Street, MANCHESTER, M18 8UA
Without planning permission: 1.The laying of a hard surface exceeding 5 square metres, using nonporous materials, and without provision being made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse; 2.The erection of a boundary wall, personnel gate and motorised driveway gate exceeding 1m in height, adjacent the highway
- Authority
- Manchester City Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Householder developments
- Inspector
- Griffin E
Main issues, as the Inspector framed them
- Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control
What decided it
The requirements of the enforcement notice are not excessive as they seek only to remedy the identified breaches by reducing boundary elements to heights permitted under permitted development rights and removing inadequately drained hardstanding that does not qualify as permitted development.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®