Planning appeal decision

Dismissed18 January 20233289038

Land at East Moors Farm, St Leonards and St Ives, BH24 2SB

Seasonal change of use of the land to allow the erection of up to 6 yurts and 3 temporary eco-compostable loos

Authority
Dorset
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
leisure-sport · Other minor developments
Inspector
Fish A

Main issues, as the Inspector framed them

  • Whether or not the proposal is inappropriate development in the Green Belt having regard to any relevant development plan policy and the National Planning Policy Framework including the effect on the openness of the Green Belt
  • Whether the appeal site is a suitable location for the proposal having regard to policies relating to development in areas at risk of flooding
  • If the proposal is inappropriate development whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the development

What decided it

The moderate harm to Green Belt openness from introducing nine new structures into a previously undeveloped site, combined with failure to pass the Sequential Test for flood risk, was not clearly outweighed by the limited economic and biodiversity benefits.

Framework references: 84, 145, 147, 148, 149, 150, 168

Plan policies cited: Policy TODEV2 of the East Dorset Local Plan adopted January 2002, Policy ME6 of the Christchurch and East Dorset Local Plan Part 1 adopted April 2014

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.