Planning appeal decision
1-18 Shepherds Leas, 135 Riefield Road, Eltham, London, SE9 2RD
Planning appeal 3308233 at 1-18 Shepherds Leas, 135 Riefield Road, Eltham, London, SE9 2RD (Royal Borough of Greenwich) was dismissed on 7 September 2023 by Inspector Savage K, by written representations. The main issue, as the Inspector framed it: Whether the proposal would represent an appropriate location for a tall building, having regard to the character and appearance of the area, the effect on Metropolitan Open Land and selected strategic views.
demolition of the existing three-storey residential buildings and redevelopment of the site to provide 70 residential units (100% affordable) (Use Class C3) in a single building ranging in height from 5 to 9 storeys, with associated blue-badge parking and soft landscaping
- Authority
- Royal Borough of Greenwich
- Appeal type
- major · Planning Appeal
- Procedure
- Written Representations
- Development
- residential · Major dwellings
- Inspector
- Savage K
- Postcode
- SE9 2RD
Main issues, as the Inspector framed them
- Whether the proposal would represent an appropriate location for a tall building, having regard to the character and appearance of the area, the effect on Metropolitan Open Land and selected strategic views
What decided it
The proposal would not represent a suitable location for a tall building having regard to the established suburban character of the area and the specific adverse effects on character and appearance, which would significantly and demonstrably outweigh the benefits of delivering 70 affordable dwellings.
The considerable benefits of 70 new affordable dwellings at a time of housing land supply shortfall were outweighed by the significant environmental harm from locating a nine-storey building in an inappropriate location that would adversely affect character and appearance contrary to development plan policy and Framework design aims
What the Inspector cited
- Development plan policies
- Policy D3 London Plan (March 2021)Policy DH1 Royal Greenwich Local Plan: Core Strategy with Detailed Policies (July 2014)Policy D4 London Plan (March 2021)Policy D9 London Plan (March 2021)Policy DH2 Royal Greenwich Local Plan: Core Strategy with Detailed Policies (July 2014)Policy OS(a) Royal Greenwich Local Plan: Core Strategy with Detailed PoliciesPolicy DH(l) Royal Greenwich Local Plan: Core Strategy with Detailed PoliciesPolicy DH(g) Royal Greenwich Local Plan: Core Strategy with Detailed PoliciesPolicy H4 London Plan (March 2021)Policy H5 London Plan (March 2021)Policy H6 London Plan (March 2021)Policy H8 London Plan (March 2021)Policy H10 London Plan (March 2021)Policy H2 Royal Greenwich Local Plan: Core Strategy with Detailed Policies (July 2014)Policy H3 Royal Greenwich Local Plan: Core Strategy with Detailed Policies (July 2014)Policy G3 London Plan (March 2021)Policy D7 London Plan (March 2021)
- National Planning Policy Framework
- Paragraph 11
How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.
See how each was appliedThe decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in Royal Borough of Greenwich
The authority’s record since 2016 · every decision in 2023
- Notice varied and upheld5 June 20263362770Land to Rear of East Greenwich Fire Station, Ramac Way, Charlton, London, SE7 7AX
- Allowed28 May 202660052006 Saunders Road, Plumstead, London, SE18 1NU
- Dismissed13 April 20266001278The Observatory Building, Green Hill, Off Repository Road, Woolwich, SE18 4BN
- Allowed20 March 2026333864218, Trafalgar Grove, Greenwich , London , SE10 9TB
- Dismissed18 February 202660019687 Kidbrooke Way, London, SE30DY
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®