Planning appeal decision
P & M Haylock Farms, Moat Farm Park Lane, Castle Camps, CAMBRIDGE, CB1 4SR
without planning permission, an engineering operation comprising the excavation and formation of two lakes and the creation of earth bunds associated with the excavation of the lakes
- Authority
- South Cambridgeshire District Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Other minor developments
- Inspector
- White P
Main issues, as the Inspector framed them
- Whether the matters alleged in the breach of planning control, as stated in the Notice, have occurred as a matter of fact
What decided it
The photographic and site visit evidence demonstrated that substantial engineering operations comprising excavation and bunding had taken place on two areas of land for water collection purposes, constituting a breach of planning control that warranted enforcement action.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®