Planning appeal decision

Allowed17 September 20243321476

Land North of Chertsey Road, Shepperton, TW17 9NX

the erection of a small-scale flexible electricity generation facility with associated ancillary infrastructure, access and boundary treatment

Authority
Spelthorne Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Other minor developments
Inspector
Willis S

Main issues, as the Inspector framed them

  • The effect of the proposed development on the openness of the Green Belt
  • The effect of the proposed development on air quality with regard to the living conditions of nearby occupiers and biodiversity, including the Dumsey Meadow Site of Special Scientific Interest, Southwest London Waterbodies Special Protection Area and Ramsar site
  • Whether the proposed development appropriately supports renewable energy provision
  • Whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations, so as to amount to the very special circumstances necessary to justify the development

What decided it

The substantial weight given to the energy security and climate change benefits of the flexible electricity generation facility, combined with the locational constraints limiting alternative sites outside the Green Belt, clearly outweighed the moderate harm to Green Belt openness and justified very special circumstances.

Framework references: 11

Plan policies cited: Policy GB1, Policy EN3, Policy EN8, Policy CC1

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.