Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed29 July 20243333158

Lushill Farmyard , Castle Eaton, SN6 7TA

the demolition of existing farm buildings, conversion of stone barn and extension to create single dwelling (Class C3), erection of single new dwelling (Class C3), garages, car parking, landscaping and associated works

Authority
Swindon Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Worley E

Main issues, as the Inspector framed them

  • whether the proposal would be in a suitable location for residential development, with particular regard to the policies in the Swindon Borough Local Plan 2026, adopted 2015 and the National Planning Policy Framework
  • the effect of the proposed development on the character and appearance of the area
  • the effect of the proposed development on the North Meadow and Clattinger Farm Special Area of Conservation
  • whether there are any other material considerations that may indicate that planning permission should be granted

What decided it

The Council's inability to demonstrate adequate housing land supply, combined with the realistic fallback position of Class Q prior approval generating comparable impacts, meant the presumption in favour of sustainable development under NPPF paragraph 11(d)(i) indicated permission should be granted despite the location conflict.

The significant weight attached to the conflict with development plan policies on location and sustainable transport was outweighed by the valuable contribution to housing supply in circumstances where the Council cannot demonstrate adequate supply, the benefits to non-designated heritage assets, the moderate weight given to enhancement of site appearance, and the significant weight of the fallback position; the adverse impact does not significantly and demonstrably outweigh the benefits.

Framework references: 11

Plan policies cited: Policy SD1, Policy SD2, Policy DE1, Policy EN5, Policy EN4

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.