Planning appeal decision
3 Beech Hill Avenue, Barnet, EN4 0LW
Planning appeal 3333506 at 3 Beech Hill Avenue, Barnet, EN4 0LW (London Borough of Enfield) was allowed on 8 March 2024 by Inspector Eggleton P, by written representations. The main issue, as the Inspector framed it: Whether the proposal would be safe from flooding; and would not increase the risk of flooding elsewhere.
a raising of roof by 1.2m; single storey rear extension; small front extension by entrance door with entrance portico; elevational changes including replacement windows and doors; and internal alterations
- Authority
- London Borough of Enfield
- Appeal type
- householder · Householder (HAS)
- Procedure
- Written Representations
- Development
- residential · Householder developments
- Inspector
- Eggleton P
- Postcode
- EN4 0LW
Main issues, as the Inspector framed them
- Whether the proposal would be safe from flooding; and would not increase the risk of flooding elsewhere
What decided it
The imposition of a condition requiring submission and agreement of the swimming pool depth, construction methods, and flood mitigation measures allowed the development to proceed while ensuring the council could properly assess flood risk without constraining the other elements of the development.
The decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in London Borough of Enfield
The authority’s record since 2016 · every decision in 2024
- Dismissed27 October 2026601285577 Conway Road, London, N14 7BD
- Dismissed21 October 202660105412 Queen Annes Grove, Enfield, EN1 2JP
- Allowed20 October 2026600977328 Wolves Lane, London, N13 6DR
- Dismissed29 September 2026601020761 Hawthorn Road, London, N18 1EY
- Dismissed28 September 2026601259821 Merrivale, London, N14 4TE
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®