Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed17 May 20243333589

The Retreat Elverland Lane, Ospringe, Faversham, ME13 0SP

Planning appeal 3333589 at The Retreat Elverland Lane, Ospringe, Faversham, ME13 0SP (Swale Borough Council) was allowed on 17 May 2024 by Inspector Owen A, following a hearing. The main issue, as the Inspector framed it: the effect of the development on the character and appearance of the area and the landscape and scenic beauty of the Kent Downs National Landscape (NL).

Temporary change of use of the land for the stationing of two static mobiles and two touring caravans for Gypsy/Traveller occupation for a single family for a period of 3 years; creation of access track and associated hard and soft landscaping

Appeal type
minor · Planning Appeal
Procedure
Hearing
Development
caravan-gypsy · Change of use
Inspector
Owen A
Postcode
ME13 0SP

Main issues, as the Inspector framed them

  • the effect of the development on the character and appearance of the area and the landscape and scenic beauty of the Kent Downs National Landscape (NL)
  • whether the site is suitably located in respect of its accessibility to services and facilities
  • the effect on highway safety
  • whether the development would be likely to affect the integrity of the Swale Special Protection Area (SPA), and if so whether a mechanism to secure suitable mitigation has been secured
  • whether there are other considerations that outweigh any conflict with the development plan

What decided it

The lack of any alternative accommodation for the family and the substantial weight given to the best interests of the appellant's grandson in remaining close to his school outweighed the temporary harms to the National Landscape and accessibility.

the temporary harm to the character and appearance of the NL and poor accessibility were outweighed by the significant weight given to the lack of alternative sites and the substantial weight given to the grandson's educational best interests, justifying a temporary three-year permission

What the Inspector cited

Development plan policies
Policy DM 24Policy DM 10Policy DM 14Policy ST 1Policy DC 26Policy ST 3SD1SD2SD3SD8LLC1

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

19 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in Swale

The authority’s record since 2016 · every decision in 2024

  1. Dismissed13 October 20266004547
    Land at Plumpudding Lane, Dargate, ME13 9HB
  2. Allowed1 October 20266014749
    8, Ospringe Road, Faversham, ME13 7LJ
  3. Dismissed25 September 20266010408
    Pigeon Farm Cottage, Cold Harbour Lane, Bobbing, ME9 8NN
  4. Allowed6 August 20266011728
    Irie, Minster Drive, Minster-on-Sea, ME12 2NG
  5. Dismissed14 July 20266002253
    Land East Of Holywell Primary School, Forge Lane, Upchurch, ME9 7AD

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.