Planning appeal decision

Dismissed18 October 20243336357

Beechurst, 8 Commercial Road, DEREHAM, Norfolk, NR19 1AE

demolition of existing buildings and construction of 18 apartments

Authority
Breckland Council
Appeal type
major · Planning Appeal
Procedure
Written Representations
Development
residential · Major dwellings
Inspector
Burnham T

Main issues, as the Inspector framed them

  • The effect of the proposal on the integrity of the River Wensum SAC & Broads SAC/Ramsar with regard to nutrient neutrality
  • The effect of the proposal on the setting of Dereham Conservation Area

What decided it

The proposal cannot be concluded not to have an adverse effect on the integrity of the River Wensum SAC and Broads SAC/Ramsar due to the absence of an available nutrient neutrality mitigation strategy, which is a conflict with Policy ENV 02 that cannot be outweighed by the public benefits.

The less than substantial harm to the significance of the Conservation Area would be outweighed by the public benefits of the scheme; however, the unresolved nutrient neutrality issue and resulting conflict with Policy ENV 02 is not outweighed by those benefits, and the proposal conflicts with the development plan as a whole.

Framework references: 57, 208

Plan policies cited: Policy ENV 02, Policy ENV 07, Policy GEN 02, Policy COM 01