Planning permission granted10 July 20243336603

St Andrews Lane, Congham

Without planning permission, the unauthorised operational development involving structural infilling of former railway bridge using engineering fill and foam concrete with embankments formed on either side

Authority
King's Lynn and West Norfolk Borough Council
Appeal type
enforcement · Enforcement Notice
Procedure
Inquiry
Development
other · Other minor developments
Inspector
Renaudon L

Main issues, as the Inspector framed them

  • Whether the infilling of Congham bridge accords with the policies of the development plan for the area, particularly for the conservation of heritage assets
  • Whether other material considerations indicate a decision be taken that is not in accordance with the development plan

What decided it

The considerable (though tempered) benefit of the works in restoring a safe highway carrying capacity to the bridge, combined with the low heritage significance of the asset, outweighed the moderate heritage and slight landscape harm.

The moderate harm to the low-significance heritage asset and slightly adverse landscape/visual impact were outweighed/compensated for by the considerable benefit of a restored safe carrying capacity and the lesser benefit of removing anti-social behaviour, tipping the balance in favour of the development according with the development plan.

Framework references: 208

Plan policies cited: Policy CS08, Policy CS12, Policy DM15, Policy DM13, Policy CS06, Policy LP20, Policy 14, Policy 2