Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice varied and upheld25 March 20263340753

2 Hinksey Close, SLOUGH, SL3 8EB

Authority
Slough Borough Council
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
residential · Change of use
Inspector
King T

Main issues, as the Inspector framed them

  • Whether the operational development was immune from planning control under the four-year rule at the time the enforcement notice was issued
  • Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control
  • Whether the compliance period specified in the enforcement notice is unreasonably short

What decided it

The appellant failed to provide precise and compelling evidence that the material change of use had occurred by 13 February 2020, with the Building Control Completion Certificate and the appellant's own declaration indicating completion and occupation occurred much later, thus the development was not immune from enforcement action.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.