Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice varied and upheld10 June 20253354039

Flat B, 17 Nassington Road, London, NW3 2TX

Authority
London Borough of Camden
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
other · Householder developments
Inspector
Moss J

Main issues, as the Inspector framed them

  • Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control (ground f)
  • Whether the period specified in the notice falls short of what should reasonably be allowed (ground g)

What decided it

The evidence showed the former window was uPVC, not timber, so requiring replacement with a timber sash window would not restore the land to its pre-breach condition and therefore exceeded what was necessary to remedy the breach.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.