Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed17 February 20253354822

Land at Wild Fowl Farm, Carrington Lane, Carrington, Greater Manchester, M31 4AD

Erection of a 35 MW battery storage facility with boundary fencing, landscaping and associated infrastructure

Authority
Trafford Metropolitan Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
utilities-energy · Minor general industry/storage/warehousing
Inspector
Thomas G

Main issues, as the Inspector framed them

  • Whether the proposed development would be inappropriate development in the Green Belt
  • The effects of the development on the character and appearance of the area

What decided it

The site qualifies as grey belt land that does not strongly contribute to Green Belt purposes, and the development meets all criteria in paragraph 155 as appropriate development, particularly given the critical national need for battery storage infrastructure to enable the transition to net zero energy.

Framework references: 11, 110, 115, 143, 155, 157, 161, 163, 213

Plan policies cited: Policy L5 Trafford Core Strategy, Policy JP-S2 Places for Everyone Joint Development Plan, Policy JP-G9 Places for Everyone Joint Development Plan, Policy JP-G1 Places for Everyone Joint Development Plan, Policy JP-P1 Places for Everyone Joint Development Plan, Policy JP-G8 Places for Everyone Joint Development Plan

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.