Planning appeal decision
Pavement Outside The Rotunda Centre, Clarence Street, Kingston upon Thames, London, KT1 1QP
installation of "Pulse Smart Hub" with integrated digital screens
- Authority
- Royal Borough of Kingston Upon Thames
- Appeal type
- advert · Advertisement Appeal
- Procedure
- Written Representations
- Development
- utilities-energy · Other minor developments
- Inspector
- Wallace J
Main issues, as the Inspector framed them
- The effect of the proposal on public safety with respect to the operation of the highway
- Whether the proposal demonstrates that energy consumption has been minimised
What decided it
The proposal would have an adverse effect on public safety with respect to the operation of the highway by introducing a barrier to cyclist movement and increasing conflict between cyclists and pedestrians on a narrow pavement section adjacent to a cycle path.
Framework references: 164, 166
Plan policies cited: Kingston Core Strategy (2012) Policy DM8, Kingston Core Strategy (2012) Policy DM10, Kingston Core Strategy (2012) Policy CS14, London Plan (March 2021) Policy D3, London Plan (March 2021) Policy D8, London Plan (March 2021) Policy SI2
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®