Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice varied and upheld16 December 20253357630

Mead View, Churston Road, Churston Ferrers, BRIXHAM, TQ5 0HU

‘Without planning permission, the construction of a flat roof dormer, as shown in “Photograph 1,” onto the rear elevation of the dwelling. The dwelling is situated in the designated Churston Conservation Area.’

Authority
Torbay Council
Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
other · Householder developments
Inspector
Griffin E

Main issues, as the Inspector framed them

  • Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach of planning control
  • Whether the period for compliance of 6 months is reasonable

What decided it

The enforcement notice requirements are necessary to remedy the breach of planning control and restore the land to its condition before the unauthorised works, and the 6-month compliance period is reasonable for the demolition and debris removal work involved.

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.