Planning appeal decision
Land at Winnington Avenue, Northwich, Cheshire, CW8 4EE
Re-engineering, remediation (through the creation of a development platform), restoration, and subsequent installation of a commercial scale
- Authority
- Cheshire West and Chester
- Appeal type
- major · Planning Appeal
- Procedure
- Hearing
- Development
- utilities-energy · Other Major Developments
- Inspector
- Plenty B
Main issues, as the Inspector framed them
- the effect of the proposal on the local highway network and on highway safety
- whether material considerations would be of sufficient magnitude to outweigh any conflict found with the development plan
What decided it
The Inspector concluded that the highway network and pedestrian safety could adequately accommodate the additional HGV traffic once mitigated, removing the Council's sole reason for refusal, and that the substantial renewable energy and remediation benefits outweighed the limited residual conflict with the development plan.
the significant benefits of contamination remediation, drainage improvement, biodiversity net gain, a permissive pathway and renewable energy provision outweighed the limited conflict with the development plan (moderate landscape harm and low-level less-than-substantial heritage harm under Policy DM52)
Plan policies cited: Policy STRAT10, Policy DM52, Policy ENV4, Policy DM44, Policy DM30