Planning appeal decision

Allowed20 October 20253363132

31 Elsworthy Road, London, NW3 3BT

Planning appeal 3363132 at 31 Elsworthy Road, London, NW3 3BT (London Borough of Camden) was allowed on 20 October 2025 by Inspector Cryan M, by written representations. The main issue, as the Inspector framed it: Whether the disputed condition limiting use of air source heat pump active cooling is necessary and reasonable, having regard to development plan policies which seek to mitigate and adapt to climate change.

Erection of single storey rear extension; formation of basement with pool, front lightwell, side lightwell and basement rooflights; infilling of windows and formation of door in side elevation; rear planter; replacement of front garage door with windows; installation of five roof lights at roof level

Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Cryan M
Postcode
NW3 3BT

Main issues, as the Inspector framed them

  • Whether the disputed condition limiting use of air source heat pump active cooling is necessary and reasonable, having regard to development plan policies which seek to mitigate and adapt to climate change

What decided it

The updated thermal modelling analysis provided adequate demonstration that the cooling hierarchy had been applied and identified the specific rooms requiring active cooling, making it necessary and reasonable to amend the condition to permit cooling only in those demonstrated rooms rather than prohibit it entirely.

The requirement to mitigate climate change through limiting active cooling was balanced against the practical necessity to provide cooling in specific rooms where thermal modelling demonstrated it was required to meet thermal comfort standards, with the balance struck by permitting active cooling only in those identified rooms

What the Inspector cited

Development plan policies
Policy D1 of the 2017 Camden Local PlanPolicy CC1 of the 2017 Camden Local PlanPolicy CC2 of the 2017 Camden Local Plan

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

751 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in London Borough of Camden

The authority’s record since 2016 · every decision in 2025

  1. Dismissed13 October 20266013300
    166 Grafton Road, London, NW5 4BA
  2. Allowed12 October 20266007435
    Footpath Adjacent, 2 Castlehaven Road, London, NW1 8QU
  3. Allowed12 October 20266007433
    Footpath Adjacent, 2 Castlehaven Road, London, NW1 8QU
  4. Allowed12 October 20266007308
    Camden Road, Outside No.'s 84 - 92, London, NW1 9DY
  5. Allowed12 October 20266007299
    Camden Road, Outside No.'s 84 - 92, London, NW1 9DY

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.