Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed15 September 20253363751

Bogee Farm, St. Ervan, WADEBRIDGE, PL27 7SQ

the demolition of existing barn and proposed 2 new dwellings - in lieu of the part Q approval PA23/06441

Authority
Cornwall Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Watson S

Main issues, as the Inspector framed them

  • The effect of the proposal on the character and appearance of the surrounding area, including the setting of a Grade II listed building
  • Whether the appeal site is a suitable location for new residential development, with particular regard to its countryside location

What decided it

The moderate less-than-substantial harm to the significance of the Grade II listed building caused by the design and appearance of the proposed dwellings outweighs the modest public benefits, and the Framework requires great weight to be given to the conservation of designated heritage assets.

The modest public benefits from additional economic and social activity associated with the works and occupiers do not outweigh the moderate less-than-substantial harm to the designated heritage asset

Framework references: 212, 215

Plan policies cited: Policy P12, Policy P24, Policy 7, Policy 1, Policy 2, Policy C1

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.