Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed19 January 20263367942

33 Doncaster Road, Enfield, Edmonton, N9 7RD

the demolition of the existing structure and the erection of a single- storey dwelling between Nos 33 and 35 Doncaster Road

Authority
London Borough of Enfield
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Cryan M

Main issues, as the Inspector framed them

  • The effect of the proposed development on the character and appearance of the area
  • Whether the proposed dwelling would provide acceptable living conditions for future occupiers, with particular regard to internal space and layout
  • Whether the development would include adequate provision for cycle storage
  • Whether the development would include adequate provision for the storage and collection of refuse and recycling
  • Whether the development would incorporate adequate measures to mitigate and adapt to climate change, with particular regard to minimising energy-related CO2 emissions

What decided it

The significant and demonstrable harm to character and appearance, living conditions, and climate change mitigation outweighed the limited benefits of providing one dwelling when assessed against the Framework as a whole.

The harm arising from the development—significant harm to character and appearance, failure to provide adequate living conditions, and inadequate climate change mitigation—significantly and demonstrably outweighed the limited social and economic benefits of providing one dwelling, when assessed against the Framework taken as a whole, despite the tilted balance applying due to housing delivery shortfall.

Framework references: 11, 115, 117, 135, 163

Plan policies cited: Policy CP20, Policy CP22, Policy CP24, Policy CP25, Policy CP30, Policy DMD6, Policy DMD8, Policy DMD9, Policy DMD37, Policy DMD45, Policy DMD46, Policy DMD47, Policy DMD48, Policy DMD49, Policy DMD50, Policy DMD51, Policy DMD53, Policy D3, Policy D4, Policy D5, Policy D6, Policy D8, Policy SI2, Policy SI12, Policy T2, Policy T3, Policy T4, Policy T6, Policy T6.1, Policy T7

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.