Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed19 February 20263373358

2 The Ridgeway, Meols, CH47 9SA

outline approval (access and scale) for up to two dwellings

Authority
Wirral Metropolitan Borough Council
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Minor Dwellings
Inspector
Hughes L

Main issues, as the Inspector framed them

  • the effect of the proposed development on biodiversity
  • the effect of the proposed development on the character and appearance of the area
  • whether the proposed development would be in an appropriate location with regard to flood risk
  • whether there would be suitable access to the highway

What decided it

The proposal would cause significant harm to biodiversity including to priority habitats with inadequate mitigation, and has not demonstrated that the sequential test for flood risk has been passed, with these harms outweighing the modest benefits of two additional dwellings.

Framework references: 73, 136, 173, 174, 177, 179, 187, 193

Plan policies cited: Policy WD1, Policy WS7, Policy WD3, Policy WD4, Policy WD24, Supplementary Planning Guidance Note 10, Supplementary Planning Document 4

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.