Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed18 February 20263374614

10 Spring Bridge Mews, Ealing, LONDON, W5 2AB

demolition of existing studio offices and construction of new four storey office building with cycle store and photovoltaic panels

Authority
London Borough of Ealing
Appeal type
minor · Planning Appeal
Procedure
Hearing
Development
employment-industrial · Minor offices/R&D/light industry
Inspector
Symmons J

Main issues, as the Inspector framed them

  • The effect of the proposed development on the character and appearance of the conservation area
  • The effect of the proposed development on the character and quality of the public realm, with particular regard to the sense of enclosure and the experience of using the adjacent footpath

What decided it

The moderate public benefits of the scheme did not outweigh the great weight given to conservation of the conservation area and the harm caused by increased enclosure of the adjacent public footpath.

moderate overall positive weight attributed to the public benefits did not outweigh the great weight given to heritage conservation and the less than substantial harm identified, so the balance tipped against the proposal

Framework references: 212, 213, 215

Plan policies cited: Policy D3, Policy D4, Policy E1, Policy E3, emerging Policy E3, Policy 7C, Policy HC1, Policy 7.4, Policy 7B, Policy D8 (F and G), Policy DAA

Judgments cited: Holborn Studios Ltd v London Borough of Hackney [2017] EWHC 2823 (Admin)

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.