Planning appeal decision
10 Spring Bridge Mews, Ealing, LONDON, W5 2AB
demolition of existing studio offices and construction of new four storey office building with cycle store and photovoltaic panels
- Authority
- London Borough of Ealing
- Appeal type
- minor · Planning Appeal
- Procedure
- Hearing
- Development
- employment-industrial · Minor offices/R&D/light industry
- Inspector
- Symmons J
Main issues, as the Inspector framed them
- The effect of the proposed development on the character and appearance of the conservation area
- The effect of the proposed development on the character and quality of the public realm, with particular regard to the sense of enclosure and the experience of using the adjacent footpath
What decided it
The moderate public benefits of the scheme did not outweigh the great weight given to conservation of the conservation area and the harm caused by increased enclosure of the adjacent public footpath.
moderate overall positive weight attributed to the public benefits did not outweigh the great weight given to heritage conservation and the less than substantial harm identified, so the balance tipped against the proposal
Framework references: 212, 213, 215
Plan policies cited: Policy D3, Policy D4, Policy E1, Policy E3, emerging Policy E3, Policy 7C, Policy HC1, Policy 7.4, Policy 7B, Policy D8 (F and G), Policy DAA
Judgments cited: Holborn Studios Ltd v London Borough of Hackney [2017] EWHC 2823 (Admin)
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®