Planning appeal decision

Allowed27 April 20266001659

Land at Fendyke Farm, Off Old Fendyke, Sutton St James, PE12 0LX

construction and operation of a solar farm and battery energy storage system (BESS), vehicular access, internal access tracks, landscaping, boundary treatment, cabling and associated infrastructure

Authority
South Holland District Council
Appeal type
major · Planning Appeal
Procedure
Hearing
Development
utilities-energy · Other Major Developments
Inspector
Cowley R

Main issues, as the Inspector framed them

  • The main issue is the effect of the proposal on best and most versatile agricultural land (BMVAL).

What decided it

The substantial benefits of renewable energy generation and storage outweighed the limited and largely reversible harm to best and most versatile agricultural land.

The substantial benefits of the scheme, including its significant contribution to renewable energy generation and storage, outweighed the limited and impermanent harm to best and most versatile agricultural land.

Framework references: 187, 161, 163, 164, 168

Plan policies cited: Policy 1, Policy 2, Policy 31, Policy 31(B)