Planning appeal decision
Land at Moat Farm, Newent, GL181JG
a ground mounted photovoltaic solar farm with an electrical generating capacity of up to 49.9MW together with associated equipment, infrastructure and ancillary works
- Authority
- Forest of Dean District Council
- Appeal type
- major · Planning Appeal
- Procedure
- Hearing
- Development
- utilities-energy · Other Major Developments
- Inspector
- Plenty B
Main issues, as the Inspector framed them
- The effect of the proposal on the landscape character and the visual effects of the proposal, taking into consideration cumulative effects
- The effect of the proposal on local road users, walkers and residential occupiers from glint and glare
What decided it
The substantial and significant weight given to the renewable energy, climate change and biodiversity benefits of the scheme, together with its viable grid connection, outweighed the moderate landscape/visual harm and the less than substantial heritage harm identified.
the substantial benefits of renewable energy delivery, biodiversity net gain, economic benefits and a viable grid connection outweighed the moderate harm to landscape character and visual amenity and the less than substantial harm to heritage assets
Framework references: 212, 187
Plan policies cited: Policy CSP.1, Policy CSP.4, Policy AP1, Policy AP2, Policy AP4, Policy AP5, Policy AP7
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®