Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed28 July 20266005227

6a, Florence Avenue, Maidenhead, SL6 8SJ

Planning appeal 6005227 at 6a, Florence Avenue, Maidenhead, SL6 8SJ (Royal Borough of Windsor and Maidenhead) was dismissed on 28 July 2026 by Inspector Claire Coles, by written representations. The main issue, as the Inspector framed it: Whether or not the proposal would be appropriately located, with particular regard to the flood zone location of the appeal site and the safety of the intended occupiers.

demolition of existing garage and construction of a new one - bedroom two-person, two-storey Passivhaus standard residential dwelling

Appeal type
Planning
Procedure
Written
Development
residential
Inspector
Claire Coles
Postcode
SL6 8SJ

Main issues, as the Inspector framed them

  • Whether or not the proposal would be appropriately located, with particular regard to the flood zone location of the appeal site and the safety of the intended occupiers

What decided it

The proposal fails the sequential test required by the Framework and policy NR1, and the flood risk assessment fails to demonstrate the development would be safe for its lifetime or that floodplain storage loss would not increase flood risk elsewhere, constituting a strong reason for refusal under paragraph 11d(i) of the Framework.

The benefits of delivering a new dwelling and supporting the local economy during construction, together with Passivhaus energy and carbon performance, are not sufficient to outweigh the conflict with the development plan in respect of flood risk and the strong reason for refusal provided by the site's location in a flood risk area

What the Inspector cited

Development plan policies
Policy NR1
National Planning Policy Framework
Paragraph 175Paragraph 176Paragraph 180Paragraph 11

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

182 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in Royal Borough of Windsor and Maidenhead

The authority’s record since 2016 · every decision in 2026

  1. Allowed27 October 20266007126
    Grove Park Industrial Estate Waltham Road, White Waltham, Maidenhead, SL6 3JF
  2. Allowed26 October 20266014376
    Roseland, High Road, Cookham, Maidenhead, SL6 9JS
  3. Dismissed21 October 20266009694
    Land Adjacent to Stud Green Farm, Sturt Green, Holyport, SL62JH
  4. Dismissed9 October 20266009005
    59 to 61 and Land to the Rear of 59 to 61 St Leonard's Road, Windsor, SL4 3BX
  5. Notice upheld24 September 20263353235
    Sunnyside Stanwell Road, Horton, Slough, SL3 9PE

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.