Planning appeal decision
298 Cowley Road, Uxbridge, UB8 2NJ
Planning appeal 3270239 at 298 Cowley Road, Uxbridge, UB8 2NJ (London Borough of Hillingdon) was allowed in part (a split decision) on 27 July 2021 by Inspector Roberts J, by written representations. The main issue, as the Inspector framed it: Whether the matters alleged in the enforcement notices constitute a breach of planning control.
The material change of use of the land at 298 Cowley Road, Uxbridge UB8 2NJ for the storage of construction equipment comprising mainly of diggers, dump trucks and waste
- Authority
- London Borough of Hillingdon
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Change of use
- Inspector
- Roberts J
- Postcode
- UB8 2NJ
Main issues, as the Inspector framed them
- Whether the matters alleged in the enforcement notices constitute a breach of planning control
What decided it
The use and structures were not authorised by any planning permission, express or deemed under the GPDO, and therefore constituted breaches of planning control.
The decision letter
Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.
With an account
What an account adds to this decision


More decisions in London Borough of Hillingdon
The authority’s record since 2016 · every decision in 2021
- Notice varied and upheld29 September 2026334896765 Blunts Avenue, Sipson, West Drayton, UB7 0DS
- Notice varied and upheld22 September 202633632552 Milton Close, Hayes, UB4 0DE
- Notice varied and upheld22 September 202633632472 Milton Close, Hayes, UB4 0DE
- Notice varied and upheld11 September 20263359383Land at 7 Waverley Close, Hayes, UB3 4AJ
- Notice varied and upheld4 September 2026336605326 Otterfield Road, West Drayton, UB7 8PE
The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®