Dismissed12 October 20213271927

Area of Pavement, High Street, London, N14 6EE

the erection of an 18 metre high Phase 8 telecommunications pole with built-in cabinet, 3no. separate cabinets and ancillary works

Authority
London Borough of Enfield
Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
telecoms · Other minor developments
Inspector
Thandi B

Main issues, as the Inspector framed them

  • The effect of the proposed development upon the character and appearance of the area including whether it would preserve or enhance the character or appearance of the Conservation Area
  • The effect of the proposed development upon the pedestrian environment

What decided it

The harmful effect of the proposed development upon the character and appearance of the Conservation Area and its adverse impact on pedestrian movement could not be justified by the telecommunications benefits, particularly given the statutory duty under section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990.

The benefits of improved telecommunications coverage and 5G network provision were outweighed by the less-than-substantial harm to the significance of the heritage asset and the adverse effects on pedestrian safety and movement.

Framework references: 114, 202

Plan policies cited: CP30, CP31, DMD37, DMD44, D1, D4, D8, HC1, CP24, CP25, DMD47