Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed4 February 20223273883

Land at Coldharbour Lane, North Chailey, Lewes, BN8 4HJ

construction of 18 entry level affordable dwellings (as defined by paragraph 71 of the NPPF) together with new access and parking and landscaping of the site (Outline planning application to establish access and layout only)

Authority
Lewes District Council
Appeal type
major · Planning Appeal
Procedure
Written Representations
Development
residential · Major dwellings
Inspector
Buchanan R
Postcode
BN8 4HJ

Main issues, as the Inspector framed them

  • whether the site would be suitable for residential use, having regard to ground conditions
  • whether the site would be an appropriate location for entry-level affordable housing, having regard to local and national policy for housing, and would deliver this type of housing
  • the effect of the development on the character and appearance of the area, with reference to access, layout and its location in relation to North Chailey and Newick
  • whether the development would be acceptable in highways terms, having regard to access and layout
  • whether it would make satisfactory provision for surface water drainage, with respect to layout

What decided it

The proposal failed to demonstrate that the site was suitable for residential development given ground conditions, was not sustainably located, would cause significant harm to the character and appearance of the area by eroding the green gap between settlements, and raised unresolved highway safety and drainage concerns.

The moderate weight given to housing supply and social, economic and environmental benefits of the dwellings was significantly and demonstrably outweighed by substantial weight given to the unresolved ground contamination risk, unsustainable location, significant harm to character and appearance through erosion of the green gap between settlements, unresolved highway safety concerns, and unresolved drainage risks.

Framework references: 71, 72, 110, 111, 112

Plan policies cited: Policy DM21, Policy DM1, Policy CP13, Policy CP10, Policy CP12

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.