Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed26 January 20223277707

Flat 24, Barness Court 6-8 Westbourne Terrace, London, W2 3UW

Planning appeal 3277707 at Flat 24, Barness Court 6-8 Westbourne Terrace, London, W2 3UW (City of Westminster Council) was dismissed on 26 January 2022 by Inspector Edginton A, by written representations. The main issue, as the Inspector framed it: Whether the development and works would preserve the Grade II listed 6–30 Westbourne Terrace, or any features of special architectural interest and/or historic character that it possesses, including setting, and the settings of other listed buildings including the Grade II listed 9-14 Westbourne Crescent and 8, 2-7 Westbourne Crescent; and whether the development and works would preserve or enhance the character or appearance of the Bayswater Conservation Area.

Layout adjustment, full refurbishment and replacement of all windows in the flat

Appeal type
minor · Planning Appeal
Procedure
Written Representations
Development
residential · Other minor developments
Inspector
Edginton A
Postcode
W2 3UW

Main issues, as the Inspector framed them

  • Whether the development and works would preserve the Grade II listed 6–30 Westbourne Terrace, or any features of special architectural interest and/or historic character that it possesses, including setting, and the settings of other listed buildings including the Grade II listed 9-14 Westbourne Crescent and 8, 2-7 Westbourne Crescent; and whether the development and works would preserve or enhance the character or appearance of the Bayswater Conservation Area

What decided it

The proposed window and door designs would introduce inconsistency with the existing window grid and detract from the heritage significance of the Grade II listed building and the character of the conservation area, with insufficient public benefits to outweigh this harm.

What the Inspector cited

Development plan policies
Policy 38Policy 39Policy 39KPolicy 40
National Planning Policy Framework
Paragraph 202

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

At least 826 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in City of Westminster Council

The authority’s record since 2016 · every decision in 2022

  1. Dismissed28 October 20266012339
    1 Bear Street, London, WC2H 7DZ
  2. Dismissed28 October 20266009920
    25 Monmouth Road, London, W2 4UT
  3. Dismissed21 October 20266014604
    South Terrace, Third and Fourth Floor, 4 Matthew Parker Street, London, SW1H 9NP
  4. Dismissed21 October 20266012002
    Flat B, 9 Durham Terrace, London, W2 5PB
  5. Allowed21 October 20266011405
    17 Bruton Street, London, W1J 6QB

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.