Planning appeal decision
24 Oak hall Park, Burgess Hill, West sussex, RH15 0BX
the demolition of existing side extension to 24 Oak Hall Park and construction of new 2 bedroom detached dwelling with access driveway
- Authority
- Mid Sussex District Council
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- residential · Minor Dwellings
- Inspector
- Price A
Main issues, as the Inspector framed them
- The effect of the proposed development on the character and appearance of the street scene and surrounding area
- The effect of the proposed development on the living conditions of the occupants of 24 Oak Hall Park, with particular regard to the potential for noise and disturbance
- The effect of the proposed development on surface water drainage
What decided it
The proposed development would cause material harm to the character and appearance of the street scene through incongruous design and siting, harm to neighbouring living conditions through noise and disturbance, and fail to adequately demonstrate compliance with surface water drainage requirements.
Framework references: 130
Plan policies cited: Policy DP26, Policy DP41, Policy H2
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®