Planning appeal decision
Field View Alby Hill, Alby, NORWICH, NR11 7PJ
without planning permission: (i) Operational development consisting of the erection of a self-contained residential dwelling (ii) Operational development consisting of the erection of a garage (iii) The material change of use of the land from agriculture to residential use
- Authority
- North Norfolk District Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- residential · Change of use
- Inspector
- Dyer S
Main issues, as the Inspector framed them
- Whether the requirements of the enforcement notice flow logically from the alleged breach of planning control
What decided it
The requirements of the enforcement notice do not flow logically from the alleged breach because they fail to require cessation of the residential use, and the notice cannot be corrected without causing injustice to the appellant.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®