Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed19 June 20233299906

LAND OFF HERRISON ROAD, Charlton Down , Dorset, DT2 9XX

outline application including access, with all other matters reserved, for up to 50 (maximum) residential dwellings

Authority
Dorset
Appeal type
major · Planning Appeal
Procedure
Written Representations
Development
residential · Major dwellings
Inspector
Edwards S

Main issues, as the Inspector framed them

  • Whether the appeal site represents a suitable location for the proposal, having regard to national and local planning policies, which seek to restrict residential development in the countryside
  • The effect of the proposal on the special interest of the Charlton Down Conservation Area, nearby listed buildings and non-designated heritage assets (including nos 1-2, 5 and 6-11 Herrison Road, the earth works of Herrison Deserted Medieval Village and the earth works of the Deserted Settlement near Herrison House)
  • The effect of the proposal on the character and appearance of the area, including the setting of the Dorset Area of Outstanding Natural Beauty (AONB)

What decided it

The identified harm to the conservation area, non-designated heritage assets, rural character and AONB setting, combined with the unsuitability of the location for residential development contrary to the development plan, significantly outweighed the benefits of housing supply and economic benefits.

The moderate benefits of housing supply and limited economic benefits were significantly outweighed by the less than substantial harm to the Charlton Down Conservation Area, significant harm to non-designated heritage assets, unacceptable harm to rural character and appearance including the setting of the Dorset AONB, and conflict with the adopted strategy for locating residential development.

Framework references: 11, 56, 124, 130, 174, 176, 202

Plan policies cited: Policy SUS2, Policy ENV1, Policy ENV4, Policy ENV10, Policy HOUS1, Policy COM1, Policies C1, C2 and C4 of the Dorset AONB Management Plan 2019-2024

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.