Town Planner Pro
Search appeal decisions

Planning appeal decision

Allowed5 May 20233307710

Land south east of South Lancashire Industrial Estate, Lockett Road, Wigan, WN4 8TP

an outline planning application with details of means of access (partial details of access and details of scale, layout, appearance and landscape are reserved) for the erection of up to 625,000 sqft (58,064sqm) (GIA) of industrial, storage and distribution floorspace with ancillary offices (Use Classes B2, B8 and E(g)), construction of primary estate road off Bolton Road and associated works

Authority
Wigan Metropolitan Borough Council
Appeal type
major · Planning Appeal
Procedure
Inquiry
Development
employment-industrial · Major general industry/storage/warehousing
Inspector
Longmuir J

Main issues, as the Inspector framed them

  • the effect of the proposal on the openness of the Green Belt and whether any harm by reason of inappropriateness and any other harm would be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal
  • the effect of the proposal on the operation of the local road network, in particular congestion and pedestrian safety, notwithstanding the mitigation proposed

What decided it

The very considerable employment and economic benefits of implementing a long-standing but previously undeliverable employment allocation clearly and demonstrably outweighed the very limited Green Belt harm, establishing very special circumstances.

the very considerable benefits of the proposal (delivery of a long-allocated employment site, substantial job creation, reduced out-commuting, and environmental/transport benefits) clearly and demonstrably outweighed the very limited Green Belt harm, to which substantial weight was given, so as to amount to very special circumstances

Framework references: 2, 8, 11, 56, 57, 111, 137, 138, 147, 148, 150, 180

Plan policies cited: Policy CP8, Policy CP7, Policy CP12, Policy CP5, Policy EM1A

Judgments cited: R (Hawkhurst PC) v Tunbridge Wells BC & Ors. [2020] EWHC 3019 Admin) at [138]

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.