Town Planner Pro
Search appeal decisions

Planning appeal decision

Notice varied and upheld1 October 20243310246

Land to the Rear of 88/90 Nightingale Road, Accessed R/O 49/51 Beacon Road, Hither Green, Lewisham, SE13 6ED

Planning appeal 3310246 at Land to the Rear of 88/90 Nightingale Road, Accessed R/O 49/51 Beacon Road, Hither Green, Lewisham, SE13 6ED (London Borough of Lewisham) was allowed in part (a split decision) on 1 October 2024 by Inspector Bale M, by written representations. The main issue, as the Inspector framed it: The effect of the development on the highway network, with regard to parking provision.

the use of land as communal amenity space and the installation of 4 no. electric car charging points with provision for parking, and the erection of a cycle store, all for the use of the residents of Nos. 1-5 Mitre Mews (r/o 49a Beacon Road) and Nos. 1-9 (r/o 51a Beacon Road). Summary

Appeal type
enforcement · Enforcement Notice
Procedure
Written Representations
Development
other · Other minor developments
Inspector
Bale M
Postcode
SE13 6ED

Main issues, as the Inspector framed them

  • The effect of the development on the highway network, with regard to parking provision
  • The effect on the living conditions of nearby residents with particular regard to noise, disturbance and air quality
  • The effect of the development on the character and appearance of the area

What decided it

The parking provision exceeds maximum standards set in the London Plan and would lead to deterioration of air quality within an Air Quality Management Area, contrary to development plan policies.

What the Inspector cited

Development plan policies
London Plan Policy T6London Plan Policy T6.1London Plan Policy T1London Plan Policy T2London Plan Policy D4London Plan Policy SI1Lewisham Core Strategy Policy 14Lewisham Core Strategy Policy 9Lewisham Core Strategy Policy 15Lewisham Development Management Local Plan Policy 29Lewisham Development Management Local Plan Policy 30Lewisham Development Management Local Plan Policy 33

How the Inspector dealt with each one is set out in the app, in order: the development plan, national policy, housing land supply, other considerations and the planning balance, beside the letter.

See how each was applied

The decision letter

Town Planner Pro holds this letter. The Appeals plan opens it and every other letter we hold, all of them searchable, with the main issues and what decided each case picked out. We do not show letters on the free site because they carry people’s names and addresses.

With an account

What an account adds to this decision

518 other decided appeals within two kilometres of this site. In the app every dot opens its decision, and its letter wherever one was published, and you can draw your own site to see what has been decided around it.AllowedDismissedSplitThis decision
An appeal decision in the app, with the main issues, policies and judgments cited picked out beside the letter
Every letter, there to read. We pick out the main issues, the policies and the judgments cited, so you can work through the letter faster.
Searching the full text of appeal decision letters in the app
Search inside every letter. By words or by meaning, filtered by authority, outcome, appeal type and procedure, with every locatable decision on the map and the Inspector named on each.
Start your free trial

More decisions in London Borough of Lewisham

The authority’s record since 2016 · every decision in 2024

  1. Allowed23 October 20266013784
    58a Manor Park, Hither Green, London, SE13 5RL
  2. Allowed11 September 20266004929
    1 - 3A Doggett Road, London, SE6 4PZ
  3. Dismissed4 September 20266010822
    Land Adjacent to 115 Loampit Vale, London, SE13 7TG
  4. Quashed On Legal Grounds29 July 20263350448
    Bestfood Supermarket, 30 Loampit Hill, London, SE13 7SW
  5. Dismissed8 July 20266005937
    1 A Harcourt Road, London, SE4 2AJ

The main issues, what decided it, the planning balance and the policies and judgments listed as cited are read from the published letter by Town Planner Pro and are our summary, not the Inspector’s words; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every appeal around it, with its letter to read and the main issues, policies and judgments cited picked out.