Planning appeal decision
1 Church Passage, BARNET, EN5 4QS
second floor extension including front dormer windows to provide 2no. self-contained flats with private terrace area and rooflights to rear elevation. Replacement of first floor windows and associated internal alterations to the central stair and re-arranging unit 2 on the first floor
- Authority
- London Borough of Barnet
- Appeal type
- minor · Planning Appeal
- Procedure
- Written Representations
- Development
- residential · Other minor developments
- Inspector
- Bayliss G
Main issues, as the Inspector framed them
- The effect of the development on the character or appearance of the Wood Street Conservation Area and the setting and significance of nearby heritage assets
What decided it
The uncharacteristic and overly complex stepped roof form, design and detailing would cause less than substantial harm to the significance of designated heritage assets that could not be justified by the limited public benefits of the proposal.
Framework references: 189, 199, 200, 202, 203
Plan policies cited: Policy D1, Policy D4, Policy HC1, Policy CS1, Policy CS5, Policy DM01, Policy DM06
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®