Planning appeal decision
91 The Greenway, LONDON, NW9 5AR
Retention of external canopy on the rear side of the property (Retrospective Application). This
- Authority
- London Borough of Barnet
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Householder developments
- Inspector
- Satheesan R
Main issues, as the Inspector framed them
- the effect of the development upon the character and appearance of the host building and area
- the living conditions for the neighbouring occupiers of Nos 89 and 93 The Greenway, with particular regard to outlook
What decided it
The excessive depth and poor quality design of the canopy extension causes unacceptable harm to both the character and appearance of the area and the outlook of neighbouring occupiers, with no material considerations outweighing these harms.
Plan policies cited: Policy DM01 of the Barnet Local Plan Development Management Policies DPD, 2012, Policy CS5 of the Barnet's Local Plan Core Strategy DPD, 2012, Barnet's Local Plan Supplementary Planning Document Residential Design Guidance, 2016
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®