Planning appeal decision
Beauchamp Arms, Ferry Road, Carlton St Peter, Norfolk, NR14 6DH
Without planning permission, operational development comprising the construction of a raised, kerbed structure and the installation of 3 lighting columns as shown in the approximate positions mark ed, respectively, within the dotted red line and by 3 crosses on the attached plan of the Land”
- Authority
- Broads
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- caravan-gypsy · Change of use
- Inspector
- Blackwell J
Main issues, as the Inspector framed them
- Whether the stationing of a caravan for residential use constitutes a breach of planning control
- Whether the development was immune from enforcement on the date of the enforcement notice
- Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach
What decided it
The appellants failed to demonstrate on the balance of probability that the caravan was used ancillary to the pub or that it had been occupied continuously and uninterrupted for ten years prior to the enforcement notice, meaning the material change of use constituted an unlawful breach of planning control.
The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.
®