Planning appeal decision
29 Furnace Parade, TIPTON, DY4 9BB
without planning permission, the construction of a fence and gate to the front of the land over 1 metre in height and the construction of a fence to the rear of the land over 2 metres in height
- Authority
- Sandwell Metropolitan Borough Council
- Appeal type
- enforcement · Enforcement Notice
- Procedure
- Written Representations
- Development
- other · Householder developments
- Inspector
- Dudley G
Main issues, as the Inspector framed them
- Whether the construction of fences and a gate constitutes a breach of planning control
- Whether the steps required by the enforcement notice exceed what is necessary to remedy the breach
- The appropriate period for compliance with the enforcement notice
What decided it
The fences exceed the heights permitted under permitted development rights and therefore constitute a breach of planning control that must be remedied, but a reasonable compliance period of three months rather than four weeks is appropriate.