Town Planner Pro
Search appeal decisions

Planning appeal decision

Dismissed30 April 20243328066

87 Peaberry Court, Greyhound Hill, London , NW4 4JE

internal alterations to ten existing flats. Front, side and rear extensions to create fifty one additional self-contained flats. Ground to roof front extension to main entrance for the provision of a lift. Provision of plant equipment on the roof. Replacement of existing brick and render facade with new brick and render facade. Provision of balconies, private and communal amenity areas and associated cycle storage and refuse. Reallocation of existing car parking spaces in the basement

Authority
London Borough of Barnet
Appeal type
major · Planning Appeal
Procedure
Written Representations
Development
residential · Major dwellings
Inspector
Livingstone C

Main issues, as the Inspector framed them

  • Whether the appeal site is a suitable location for the development proposed having particular regard to the development plan's policies relating to tall buildings, including considering the effect of the proposal upon the character and appearance of the area.

What decided it

The appeal site is not a suitable location for a tall building as it falls outside the identified strategic locations in Policy CS5, and the proposal would fail to integrate with the existing urban fabric and harm the character and appearance of the area.

The significant benefits of 51 new energy-efficient homes, brownfield redevelopment, and improved living conditions for existing occupants do not outweigh the harm caused by the tall building in an unsuitable location and its harmful effect on character and appearance.

Plan policies cited: Policy D9 of the London Plan 2021, Policy D3 of the London Plan 2021, Policy H1 of the London Plan 2021, Policy D6 of the London Plan 2021, SI 2 of the London Plan 2021, Policy CS5 of Barnet's Local Plan Core Strategy 2012, Policy DM05 of Barnet's Local Plan Development Management Policies 2012, Policy DM01 of Barnet's Local Plan Development Management Policies 2012, Policy D1 of the London Plan 2021, Policy CS NPPF of Barnet's Local Plan Core Strategy 2012, Policy CDH04 of Barnet's Draft Local Plan

The main issues and the deciding factor are read from the published letter by Town Planner Pro; the letter itself is the record. Contains public sector information licensed under the Open Government Licence v3.0. Research, not advice.

In the app this decision sits on the map beside every other appeal around it, with the full reasoning summary, the letter held on file, and the case law it applies.